BADDATE9Incorrect date or time format. The available date formats are: 10 Sep 1988 - DD/MM/YY Sep 10 1988 - MM/DD/YY 1988 09 10 - YY/MM/DD The available time formats are: 3:24 pm - am/pm 15:24 - 24 hour Type the date or time again using the format you selected in SETUP.  BADTDURý Incorrect duration format. Either: o Type the duration again, using the format: 10.00 Dys W. o Type Res to set the duration type to Resource. HPM will make the task duration equal to the longest time a resource works on the task.  BADNUMt HPM doesn't accept that number. Check the number for accuracy, and make sure it's at least %d and no more than %d.  NONCALDT#HPM has calculated a date outside the years covered by calendar '%s'. Here are some possible ways to solve this problem: o If this is the PROJECT calendar: Adjust task durations and any planned start dates you set so the project will begin and end within the span of the calendar. o If this is a RESOURCE calendar: Adjust resource allocations for resources that use this calendar, so they finish before the end of the calendar. o Check the starting year in the Calendar form, and if necessary, increase the number of years.  NONODE¿ '%s' isn't a task in this project. You may have deleted the task, or typed the name incorrectly. Check the name for spaces: for example, HPM considers the name Task1 different from Task 1.  NEEDNODE You must enter a name here.  BADINIT– There isn't enough memory to start HPM. HPM needs a minimum of 512K memory. If you have any resident programs in memory, unload them and try again.  TOOSMALLð The timescale unit is too small for HPM to display the graph--there are too many intervals. HPM allows a maximum of 100 intervals (100 days, for example). Set a larger timescale unit. Display the Format menu and select Timescale display.  FBFASTRT† You entered an actual finish before entering the actual start of task '%s' in project '%s'. Enter an actual start date for the task.  ABFESTRTº You entered an actual start that's before the earliest start of task '%s' in project '%s'. Change the actual start of the task so that it falls between earliest start and latest start.  PBFESTRT» You entered a planned start that's before the earliest start of task '%s' in project '%s'. Change the planned start of the task so that it falls between earliest start and latest start.  ASPREDNSä You entered an actual start for task '%s' in project '%s' before entering actual dates in the preceding tasks. Enter actual start and finish dates in the tasks that precede this task, and then enter actual dates for this task. BADLAGDEFIncorrect lag or link definition. You can't define lags for branches or milestones, only between two tasks. Insert an extra task, or use a zero-duration task in place of a milestone. You can't define links for branches. Move tasks to connect to a branch.  NOLAGDEF¢ There is no lag/link defined for this task. Check the PERT chart to see how your tasks are connected. You need a line between two tasks to remove a connection.  BADRANGEÙHPM doesn't accept the format you used to type a range. ~Type:~1 ~To select items with:~1 aa..bb - values between 'aa' and 'bb', inclusive aa.. - values after and including 'aa' ..aa - values up to and including 'aa' aa - values that exactly match 'aa' / - precede above ranges by a / to ~not~2 select If you're selecting a date or a duration, enter a complete value. For name fields, you can select on partial matches.  DELBRNCH£ You can't remove a branch. Be sure the name of a task is in the Remove task fill-in and press F10. Use Remove link/lag to remove a connection between two tasks.  DUPNAME9 A %s with that name already exists. Enter a unique name.  TASKMEM· You don't have enough memory to add more tasks (although you may be able to add other kinds of information to your project). Create subprojects from the project before you continue.  CIRCPROJî You can't create a circular task sequence. You can't have a task depend on itself or on a task that follows it. Look at the PERT chart to see how the tasks are related. Then select predecessor and successor tasks that aren't circular. MUSTGIVNAM Enter a name. PRJFORMATMHPM can't access project file %s. Check for the following: o The project isn't in HPM format. See Appendix B for instructions on converting files for HPM. o The file may be damaged. Delete the file and use a backup copy. o If you're running on a network, another person may now be accessing this file. Try again later. DUPSUBPRJ%s is already linked to a project. HPM allows only one link for each subproject. To use a subproject that's in a different project family: o archive the subproject, rename it, and get it, or o get and save the subproject, giving it a different name.  NOCURPRJ( You must get or create a project first.  NOCURCAL NOT USED.  UNSAVEDÛ You're about to lose your unsaved project changes. You've made changes to your project, but haven't saved them. If you press F10, your changes will be lost. To save the project, press Esc and select Get/Save/Remove.  CNTVISITè You can't visit this subproject. o Be sure that the task is a subproject task (has a thick bar across the top in the PERT chart). o Or, check that the subproject appears in the Project list under the name of the superproject.  OVRTIMErResource %s is working too many overtime hours a day in the task '%s'. You've entered a number of overtime hours per day that's greater than the maximum number of overtime hours per day you indicated when you defined the resource. You'll see a '+' next to the allocation in both the Allocations graph and the Allocations list, and next to the task in the Gantt chart. TOOMUCHEFFyTask '%s' in project '%s' is too short for all resource work to be completed. Try one of these solutions: o Lengthen the duration of the task o Type RES in the duration field so that resource work determines the duration. o Allocate more resources working shorter times o Decrease the planned work for the resources allocated to the task so that the duration decreases. RGSTR2LNG† For names, the entry on either side of the '..' must be 14 characters or fewer. For dates, each entry must be 19 characters or fewer. LNKSUBPRJc You can't link a subproject to a milestone. Link the subproject to a task that isn't a milestone.  CREATRESž You haven't defined that resource on the Resource list, but HPM can add it to the Resource list now. o Press F10 to add the resource. o Press Esc to cancel.  BLRESET5 Baseline dates are about to be set to current dates. DELALLSTRAll allocations for this project will be erased permanently. You won't be able to restore them by getting the project again. If you're not sure you want to erase allocations permanently, archive the project first. Or, remove allocations one at a time using the Allocations list. EXCDMAXSRTœ You've chosen too many fields to sort. The maximum number of sort fields is 10. Adjust the fill-in so that only 10 fields have sort numbers next to them.  DATEOUTSc That date isn't within the current calendar. You can change the date or make the calendar larger.  UNSAVCAL NOT USED. NOPRJONDISK"There are no projects in the current project directory. Before using this function, the Project list must contain one or more projects. Do one of the following. o From the Project list, change to a directory containing projects. Select Change data directory. o Create a new project.  CST2BIG° Costs are too large to be displayed. HPM can display a maximum of 10 billion dollars. You may be able to see a Per time unit graph (select in the Cost graph display fill-in). BASENOTSET¡ You must set a baseline before you can display Earned Value. HPM uses the baseline durations, starting times, and costs to draw earned value on the Cost graph.  EXPWRITE¸ About to write over file %s. An archived file with that name already exists. Press F10 to overwrite the file. Otherwise, press Esc and rename the archived file to avoid deleting it. PROJREPLACE|If you press F10, this archived project overwrites the project with the same name (and all matching subprojects). Subprojects with unique names remain in the project list, but they're unlinked. Report templates are not part of an archived file. If you have changed directories, you can copy 'HPM.TPL' from the old directory to reuse your report templates. Press Esc to cancel.  CIRCLNKYThe project is already linked to this project family. HPM allows only one link for each subproject. Unlink it from the project it's linked to, or type the name of a different project to link to this project. Look at the Project list for a list of all your projects. (Select Get/Save/Remove from the Main Menu, or use the speed key, Ctrl-L.) TRPT2WIDE-Your report is too wide for your printer. o Press Esc to cancel the report. Select Sort/Select from the Print Options menu and choose fewer columns for your report. Or, set a smaller left margin for your printer (select Setup from the Main Menu). o Press F10 to print a truncated report.  MUSTPOSÑ Two projects have similar project names (differing only by the filename extension, such as .PRJ or .ARC). Use the Up and Down arrow keys to place the Project list's triangular cursor on the correct filename. CNTSUBEXP° Subprojects of archived files can't be retrieved. Get the archived file (with .ARC after the name). HPM creates a project (.PRJ) file from which you can retrieve subprojects.  OUTSIDER<Either %s or %s came from outside this system. HPM found two projects that were created in different data directories. The second will be ignored. To move projects from directory to directory, use Archive project to make a .ARC file. Then use the DOS COPY command to copy the archived file to another directory.  MUSTSAVEy You must save a new project before creating or linking subprojects. Press F10. Then press Ctrl-S to save your project. PRJRETURN[You're about to return to project: %s. The subproject you're leaving will be saved. o Press Esc to cancel the return. If you don't want to save your subproject changes, use Get/Save/Remove to get the project you want, rather than Leave subproject. o Press F10 to save the subproject before returning to the superproject it's linked to. CANTLEVELUProject %s can't be completely leveled. o If you've set the project planned finish date in the Project form, erase it and try again. o If the project planned finish date is near the end of the calendar, increase the number of years in the calendar form. o As a last resort, don't anchor allocations that are now anchored.  INCLEVELd HPM can't level an incomplete project. Return to the PERT chart and connect any unconnected tasks. PRINTERON¨ Your printer isn't ready. Be sure it is turned on and on-line, and there's paper in the printer. o Press F10 to continue the report. o Press ESC to cancel the report.  BADPORT¯ Printer port selection error. Check that you've selected the correct port (at the Set up printer fill-in). Also, be sure that the printer is properly connected to the port.  WRNLEVEL£ HPM is about to level resources, which could make extensive changes to your project plan. Press Esc to cancel automatic resource leveling; press F10 to continue.  PRTABORT> Press F10 to continue printing; Press ESC to cancel printing. NOPTOEXPND¥ This task isn't connected to a subproject. Position the cursor on a subproject task. In the PERT chart, a subproject task is marked by a thick bar across the top. NOPRJEXISTSµ You're trying to create a subproject that has no tasks between the specified end points. Make sure the names you specify in the Create subproject fill-in enclose a group of tasks. MUSTSEL2ND&You must specify both the starting task and ending task of a subproject. HPM extracts the outer tasks you specify, and all the tasks in between to create a subproject. In place of those tasks, it leaves a subproject task (with a thick bar across the top) which is the link to the subproject.  NEWPGR Put a new page in your printer/plotter. Press F10 when you're ready to continue.  NOFIND6 Can't find '%s'. Type a different name to try again.  RPTNOPRJü To print this report, specify the project to use in one of these ways: o Select Sort/Select for this report and type the project name in the Range column of the fill-in. o Use Get/Save/Remove to get the project you want to use for this report.  NOFMTRPTÑ You can't change the %s format. The following reports can't be formatted: o Earned value report o Calendar wallchart o All graphic reports (HPM displays graphic report options when you select Run report). NONSLCTEDiThere are no items that match the ones you typed in the Sort/Select fill-in. If you're printing a report, look at the report options fill-ins. If you're formatting the Task list or Gantt chart, look at the Sort/Select Gantt chart or Sort/Select Task list fill-ins. Check that the Range field on ~both~1 pages of the Sort/Select fill-in is entered correctly. PRJNDSCALCÄ You need to recalculate your project, %s, or data in the report won't be accurate. o To recalculate: press Esc to cancel, get the project, and press Ctrl-C; o To continue printing, press F10. REDUNDLNK¥ You've tried to link two tasks that are already linked. One task already depends on the other. Look at the PERT chart for the two tasks to see how they're linked. WBADDWRGPRJè You're trying to break down a task that belongs to another project in this project tree. Get the project this task belongs to and then you can add below it. (To determine what project this task belongs to, look at the Task form.) WBDELWRGPRJ³ You can't delete a task that belongs to another project. Display the Task form to see what project this task belongs to. To delete the task, get the project the task belongs to. WBDELBRCHn You may delete only the tasks on the lowest level. To delete this task, first delete all the tasks below it. WBMOVEBRNCH© You're trying to move this upper-level task to a destination that's under itself. Check the Work breakdown structure or outline for the relationship between the tasks. WBMOVESPACE5 Enter the name of the task to place this task under. WBRENWRGPRJ#This task was created in another project. Renaming it will change the name in the Work breakdown only (not in the PERT chart). To rename the PERT chart task as well, get the project this task belongs to and then rename it. (Display the Task form to find the project this task belongs to.) LOADRANGE. Loading values are too large to be displayed. SETUPPRTRÝ You haven't set up HPM to run with a printer/plotter. Select Setup from the Main Menu and display the Print/Plot menu. For text reports, set up a text printer; for graphic reports, set up a graphics printer or plotter.  REMEFFThis task is already complete. You can't enter remaining work. Press Ctrl-T to display the Task form. Clear the Actual finish date and Percent complete fields. Then, when HPM recalculates, the task will no longer be complete and you can enter remaining work in the Allocations list.  COSTCALCÈ Costs for this project aren't up-to-date. The cost information that HPM is about to print will be inaccurate unless you recalculate your project. Press Esc to cancel the report. Then press Ctrl-C. WBMOVEWRGPRJù You're trying to move a task (or group of tasks) under a lowest level task that belongs to another project. Get the project the destination task belongs to, and then you can move under it. (Check the Task form for the name of the project to get.) WBMOVELSTMOVE NOT USED WBHIDETREE‘ You can't hide the entire tree. Add a task under Goal and then move some of the tasks under that task. Now you can hide that part of the tree. WBCANTSHOW¯ There are no hidden tasks below '%s'. Look for larger tasks with a broken lines below them. These tasks have ~hidden~1 tasks under them. Select one of these tasks to show. WBCANTHIDE‡ You can't hide a single task at the lowest level. You can hide only groups of tasks. Specify a task with at least one task under it.  WBHIDDEN] You can't %s below this task. This task has hidden tasks under it. Select Show tasks first.  WBMEMORYYour Work breakdown structure displays too many tasks. The Work breakdown structure can display a maximum of %d tasks at one time. Hide some tasks to reduce the number of visible tasks. Select Hide tasks from the Edit menu, or use the speed key, Ctrl-H.  WBNOTVIS¶ This task may be hidden. Press F10 to search hidden tasks. HPM will point to the task above the hidden task you're searching for. Then you can show all the tasks under that task. TXTRSVPROJYou must save your newly created project before printing a cross-project report or the Resources by time report. HPM looks for the project file on the disk for saving temporary information. To save your project, press F10 and then Ctrl-S. Then you can run the report. LSTCANTDEL There are no items to delete. LSTABTADDg Press F10 to add the new item and leave the list. Press Esc to cancel the addition and leave the list.  LEVABORTG Press F10 to continue resource leveling; Press Esc to cancel leveling. CALCABORTD Press F10 to continue calculating; Press Esc to cancel calculating.  PAUSEPN# Put pen number %d in your plotter. WBNOTSAVEDp You must save this project before you hide any branches. Press F10 and then press Ctrl-S to save your project.  NETERRƒError accessing HPM.NET. HPM couldn't create, open, read from, or write to the file where HPM stores user names. o Be sure the network server is working properly. o Be sure the person has Read/Write/Create access to the directory containing HPM. o Be sure the disk and directory aren't full. o If someone else is accessing the file, it may be temporarily locked. Try again later. NOCALONDISK NOT USED.  FILEERRcError accessing file %s. Check for the following problems: o The file may be damaged. Delete the file and use a backup copy. If the file is HPM.RES, and you have no backup copy, reenter your resource definitions and allocations. If it is HPM.CND, and you have no backup copy, reenter your calendar definitions. o The file you're trying to access was created by a different version of HPM and cannot be read by this version. If this is the problem use the update utility to update your files and try again. o If you're running on a network, another person may now be accessing this file.  DISKFULL˜ Error accessing file %s because the disk is full. To free disk space, exit from HPM and use the DOS ERASE command to delete non-HPM files on the disk. WRTPROTECT•Disk is write-protected or damaged. Since HPM uses the disk for temporary files, it can't run when the disk is write-protected. Remove the write-protect tab and try again. As long as you don't save projects or modify resources, your files will remain unchanged. If you are trying to a access a read/write directory on a network, HPM needs to have create access to this directory for temporary files. TOOFULL2GETð Not enough disk space to work. HPM needs about 95K of free disk space to save temporary data and allow you to add tasks to your project. To free disk space, exit from HPM and use the DOS ERASE command to delete non-HPM files on the disk. FILENTFNDCan't find file %s. o Look in the Project list for the names of the project files. These are the files HPM can get. o Exit from HPM and look in the program directory for the program files. If you're missing files here, copy them from your backup program disks. DRIVEOPEN< The drive isn't ready. Check that the drive door is closed.  MEMFULLNot enough memory to complete the command. Before continuing, you should free more memory. Here are some suggestions: o Create subprojects o Delete unneeded tasks o Delete unused resources o Make task descriptions shorter o Archive and then delete old projects PROJTOOBIGè Project is too big to get. If this project was created on a computer with more memory, it may be too big for this computer's memory. You need to go to a computer with more memory and use HPM to break the project into subprojects. WBDELLAST NOT USED DELSUBEXP© You can't delete subprojects of archived files. Get the archived file (with .ARC after the name). This will make a project (.PRJ) file you can delete subprojects from.  NOPRJEXPt Type the name of a project to archive. Be sure that the project isn't archived already (with .ARC after the name). OLDCSTGPHs Costs displayed aren't up-to-date. Press F10 and then Ctrl-C. HPM redisplays the cost graph with the new values. CNTRETURN` This project isn't linked to a superproject. Use Leave subproject when you're in a subproject. MAXSRTITMS� HPM can't sort all the items you've selected for the report. Select fewer items for sorting in the Range column of the Format report fill-in.  BADDIRv HPM can't change directories as you specified. Check the complete directory pathname and complete the fill-in again. WRGVISWINT To visit a subproject, go to the PERT chart, Gantt chart, Task list, or Fast track. CALNOTNAMED NOT USED. NOCALMATCH NOT USED. WILLSAVCAL NOT USED. WILLSAVPRJÅ About to save your current changes. HPM saves your current work when it creates, links, expands, or visits subprojects. o Press F10 to save your project and then continue. o Press Esc to cancel. CNTDELLAST§ You can't delete the last task in your project. To delete this project, select Get/Save/Remove from the Main Menu. Display the Files menu and select Remove project. CNTDELSUBÍ You can't delete a subproject task. This task is connected to a subproject. To delete it, first unlink the subproject: display the Edit menu, select Link subproject, and clear the Subproject name field. CNTDELROOT� You can't delete the root task. To delete this whole project, select Get/Save/Remove from the Main Menu, display the Files menu, and select Remove project.  PLTABORT> Press F10 to continue plotting; Press Esc to cancel plotting.  BLDABORT< Press F10 to continue processing data; Press Esc to cancel. PLOTTERONà Your plotter isn't ready. Be sure your plotter is turned on and ready to plot (on line), and there's paper in the plotter. o Press F10 to continue the report. o Press ESC to cancel the report.  OVRHOURScResource '%s' is working too many hours a day in the task '%s'. You've entered a number of working hours per day that's greater than the number of working hours per day in the calendar that is used by this resource. You'll see a '+' next to the allocation in both the Allocations graph and the Allocations list, and next to the task in the Gantt chart. WONTLEVELEThere are too many of the resource '%s' allocated to the task '%s'. HPM can't level this conflict because the quantity in the resource allocation is greater than the quantity in the Resource list (where the resource is defined). Increase the quantity in the Resource list, or decrease the quantity in the Allocations list. NOTENOUGHHDLSEThere aren't enough file handles to run HPM. HPM may require up to 20 files open at one time. To make sure you have enough files available, check that the CONFIG.SYS file in your root directory has a line that looks like: files = 20 Then start your computer system again and run HPM. See Appendix B for more information. ANALWILSAVCAL NOT USED.  ANALCALNOTNAMED NOT USED. CANTEXTRACT8 You can't create a subproject that's the entire project  CANTDELI HPM can't delete this project unless you save the current project first. CANTPRINT~ Not enough memory to run a graphic report for the selected printer. Try running on a 640K machine, or selecting low quality.  CALNTFND NOT USED.  SAVEASSaving to a different filename will ~not~1 save ~resource~1 ~allocations~1 or ~subprojects~1. If you've made any changes that you want saved, press Esc and save the changes to the original filename first. To save and/or copy allocations and subprojects use ~archive~1.  FILEDELKError accessing file %s. HPM can't read or update the information in the file. Exit from HPM and use the DOS ERASE command to delete this file. o If this is the HPM.SET file, reselect your printers, plotter, and monitor. o If this is the HPM.SS file, set up the sort/select information for your projects and reports again.  EXITTUTr About to exit tutorials. o Press F10 to end the tutorials and exit HPM. o Press Esc to return to Tutorials menu. NETACCESSr Access to program denied. Two people can't run a single-user HPM application. from the network at the same time.  NETUSEq Access to program denied. Two people can't run a single-user HPM application from the network at the same time.  USERDIRvCan't create or update your personal directory. Be sure the disk and directory that contain HPM's program files aren't full and that the person has Read/Write/Create access to the directory. Also be sure that only the personal subdirectory has the same first eight characters as the person's name, and that these characters are unique among all user names on the network.  NOAPPLICì Can't find HPM.EXE. The application can't find its initial program file on the system. Be sure the file hasn't been renamed, moved, or deleted. Also be sure the correct path to the program directory is added to the DOS PATH command.  NETNAMEÆ Your name on the network is invalid. To run on a network, each workstation must have a unique network (machine or node) name that contains only acceptable characters. Assign a unique, valid name. UNKNOWNFILEÐ There is already a file, %s, on the disk. Possible solutions: o Check to see if the file must reside on this directory. If not, delete it. o Use HPM to rename %s.ARC so its name doesn't conflict. NOPRTFILNAM6 Enter a filename, or print to the printer or plotter. WRTGTOPRTRÀ You selected print to the printer or to the plotter, but there's an entry in the filename field. o Press Esc to return to the fill-in. o Press F10 to print the report to the printer/plotter. PRTFILEXSTg The file, %s, already exists. o Press Esc to cancel the operation. o Press F10 to overwrite the file. NORESSLCT" No resource has been defined yet. RCSTMEMERR� Not enough memory to print the Resource by time report. To print this report, choose fewer time intervals in the Timescale display fill-in. PRT2DSKERR Error writing disk file. CONFIGERRz Can't read information from your Setup file. Select your text and graphic printers, plotter, and color preference again.  NEVERALL NOT USED. BADFRMPOP?Can't put up form/fill-in. Check for the following: o There isn't enough memory. Create subprojects and remove unneeded resources and projects to free memory. Sometimes, exiting and reentering HPM helps. o HPM couldn't read the HPM.DAT file. Exit from HPM and copy HPM.DAT from your program disks. WBNEEDNODE" Enter a task name in the fill-in. CALNOWORKINGŽ This calendar has no working days in a week (each day is defined as a holiday). HPM requires at least one day each week to be a working day. CALNOHOURSd This calendar has a working day of 0 hours. HPM requires a working day to be greater than 0 hours. WBNOTASKS0 There are no Work breakdown tasks for level %d. CANTFINDSS§ %s is a task in this project, but your window is formatted so that the task doesn't appear. The Format menu contains the format command to change the window display. TXTRLMBIGi Your left margin setting is too wide. Reset the left margin setting in the Set up text printer fill-in. CALBIGHOURSÊ This calendar has too many hours in a working day. HPM requires a working day to end before midnight. Be sure that the sum of the working hours in a day plus the starting time doesn't exceed 24 hours.  NOPATHf HPM will print the report to file %s in the ~current~1 directory (where you keep your project files).  NOTIMRELœ You can display the PERT chart in time relative format only when all calculations are up-to-date. Until you recalculate, the normal placement will appear.  SSMEMFULNot enough memory to sort/select items. Until you free memory, HPM will try to list all the items unsorted. To free more memory: o Create subprojects o Delete unneeded tasks o Delete unused resources o Make task descriptions shorter o Archive and then delete old projects  MOVELAGN You can't move tasks with lags. First remove the lag and then move the task. CNTLNKNOTASK+ Specify a task to link this subproject to.  PORTNAME- HPM doesn't accept the filename you entered.  CSTRANGEk HPM doesn't accept that cost. Check the number for accuracy, and be sure it's no greater than 99999999.99 WBSTOOBIGõ Work breakdown structure is too big to get. Your computer doesn't have enough memory to read in all the Work breakdown tasks that are ~showing~1. Go to a computer with more memory and ~hide~1 some of the Work breakdown tasks. Then try again.  RLMEMFULÛ There isn't enough memory to show the Resource list. You should be able to show the list if you exit and reenter HPM, and then show the Resource list before getting a project. If not, use a computer with more memory.  NOCALWALS You can't print the Calendar wallchart to a dBASE, Lotus, or Delimited ASCII file.  SUBINCÝ HPM can't calculate your project because of an incomplete subproject. Go to the Project list and look for an ~I~1 next to the names of the subprojects in this project family. Get those projects and connect their tasks. PRTDSKFULÒ Disk is too full for the print file. HPM needs to save extra space on the disk to work with your projects. To free disk space, exit from HPM and use the DOS ERASE command to delete non-HPM files on the disk.  FULDESC4Not enough memory to read in the descriptions for your tasks. If you save this project, those descriptions will be lost. You can use a computer with more memory. Otherwise, try exiting and reentering HPM first. Then if you can read in the project, you should make subprojects or shorten your descriptions. MUSTDELALLOC¥ About to delete the allocations for this task before linking the subproject. o Press Esc to return to the fill-in. o Press F10 to delete the allocations and go on. NOTMFRMREP­ You can print the Task and Milestone form report only to the printer or to a print file. Use the Task and Milestone list report to output information in different formats.  LAGPRJÙ Task '%s' in project '%s' has a lag definition that causes its early start to happen before the early start of its predecessor. Adjust the lag so the task's start occurs after the start of the task that precedes it.  MUSTDELH You must delete one task before HPM has room to create this subproject.  LAGEXPY You can't expand subprojects until you remove all lags defined with the subproject task.  MAXIDSz You've reached an internal limit of HPM. To work with this project, save it, archive it, and then get the archived file.  CLCSUBû Dates aren't accurate yet. You may have subprojects with tasks using elapsed and working time, subprojects with calendars using different working times, or subprojects with constraints or planned dates. Press F10 and then Ctrl-C to calculate again.  NEGSUB Project %s has negative slack.  SAVEARK½ About to save your current changes. HPM saves your changes when it archives the current project. o Press Esc to return to the fill-in. o Press F10 to save your changes and then continue.  ALLCFULi Not enough memory to analyze the allocations for %s. Remove some allocations for this %s and try again.  SAVECAL NOT USED.  PRTWRT5HPM can't access temporary print file. HPM uses a temporary disk file for large graphic printed and plotted reports. There's not enough disk space for this temporary file. To free disk space, exit from HPM and use the DOS ERASE command to delete non-HPM files on the disk or delete unneeded project files.  NOTAFUNCA You can't select this function on the trial size version of HPM.  NOWBNODEØ %s is not a visible Work breakdown task. You may have typed the wrong task name or the task with this name may be hidden. If the task is hidden, select Show tasks (or use the speed key, Ctrl-U) to make it visible. STRMESSAGE %s PROJ2EARLY› You entered a planned start for project %s that is earlier than its earliest start. This will cause negative slack in other projects in the project tree. PROJ2LATE™ You entered a planned finish for project %s that is later than its latest finish. This will cause negative slack in other projects in the project tree. NOSPACEUNARCHNot enough disk space to work. HPM needs about %dK of free disk space to save temporary data and allow you to add tasks to your project. To free disk space, exit from HPM and use the DOS ERASE command to delete non-HPM files on the disk or delete unneeded project files. GENSAVCAL NOT USED. FILESSOLDwYour HPM.SS file is from the previous HPM version. HPM.SS is used to store sort/select information for your projects and reports. Do one of the following: o Run the update program to change HPM.SS to the current version. o Exit from HPM and use the DOS ERASE command to delete this file. Then set up the sort/select information for your projects and reports again. WBODISPCUT1Æ You can't %s below this task. The new level you're creating will not be displayed because you set HPM to display the first %d levels. Use the Format menu to change the number of levels displayed. WBODISPCUT2Ä You can't %s below this task. Tasks ~under~1 the previous task are not displayed because you set HPM to display the first %d levels. Use the Format menu to change the number of levels displayed. WBOCANTSHOW› There are no hidden tasks below '%s'. Tasks with a ~#~1 to the left of the task name have ~hidden~1 tasks under them. Select one of these tasks to show. WBRESPWRGPRJXThis task was created in another project. Changing the responsible field affects only the Work breakdown structure (not the PERT chart). To change the responsible field in the PERT chart task as well, visit the project this task belongs to and then change it. (Look at the Work breakdown Task form to find the project this task belongs to.)  WRNOPTIMÐ HPM is about to optimize, which could make extensive changes to your project plan. It is recommended that you archive your project before optimizing. Press Esc to cancel optimization; press F10 to continue.  OPTABORT… Optimization was interrupted. Press F10 to continue optimizing; Press Esc to stop. (Not all the project will be optimized.)  CREATCAL~ You haven't defined the calendar '%s', but HPM can create it now. o Press F10 to create the calendar. o Press Esc to cancel. MAXTOOSMALLY You entered a maximum quantity for resource '%s' that is less than the minimum quantity.  WBSUMFRMÓ Not enough memory to summarize the Work breakdown information. HPM displays the form with blanks where the summary information should be. Hide the part of the Work breakdown structure you are not working with.  WBSUMLST@Not enough memory to summarize the Work breakdown information. HPM displays the list with blanks where the summary information should be. To see the summary: o Hide part of the list that you're not working with. o Collapse part of the list so only the higher levels are displayed (an option from the Format menu). FTMOVNOTASKn Place the cursor on the task you want to move before you press Ctrl-M or select Move task from the Edit menu. FTLAGHERE5 There is a lag here, so you can't place a task here. FTMVACTUALSà Task, %s, contains actual start or finish dates, so you can't move it horizontally. o Press F10 to remove actual dates for this task. o Press Esc if you don't want to change the dates. FTMOVLAGTSKh This task has a lag connected to it. Remove the lag while in the Pert or Gantt chart before moving it.  TPLNOTPLs No report templates have been created. Select Create template from the Templates menu to create report templates. TPLBADNAMEu There is no report template with that name. Check your spelling, or use the arrow keys to select a template to use. REPBADNAMEc There is no report with that name. Check your spelling, or use the arrow keys to select a report. TPLMAXIMUMŒ The maximum number (50) of templates in a directory has been reached. Use Remove template to delete templates that you're no longer using. TPLNONAME% Enter a name for the report template TPLDUPNAMES There is already a template with that name. Enter a unique name for this template. TPLINVNAME� That is an invalid name. Alphabetic characters, numbers, and punctuation marks are valid characters to use in a template name. TPLNORUNTPLƒ No report templates have been created. Use Create template to create a report template. Then use the template to run your report. TPLDBERRORx Error accessing file HPM.TPL. Exit HPM and delete HPM.TPL. A new template file will be created when you restart HPM. LCKPRJRDONLYP Project %s is checked out by %s. Do you want a read-only copy of this project ? LCKCALRDONLY\ Calendar %s is currently checked out by %s. Do you want a read-only copy of this calendar ?  LCKPRJSVRDONLY- You can't save a read-only copy of a project  WBONOSHOWCOLLAPÆ There are no hidden tasks below '%s'. Since you set HPM to display the first %d levels, the tasks below this task have been collapsed. Use the Format menu to change the number of levels displayed. WBONOTVISThis task may be hidden or collapsed. Press F10 to search hidden and collapsed tasks. HPM will point to the visible task above the task you're searching for. Then you can: o Show all the tasks under that task. o Reveal lower levels of the outline from the Format menu. CPDELTROWF If you press F10, all tasks and any note on this row will be deleted. CANTDELROW¹ This row contains a subproject task. To delete it, first unlink the subproject. Display the PERT chart and select Link subproject from the Edit menu. Clear the Subproject name field. LCKPRJEXCLV Can't perform the operation you requested. Project %s is currently checked out by %s. LCKPRJARCHIVE1 You can't archive a read-only copy of a project. LCKPRJLNKEXCLC You can't perform that operation on a read-only copy of a project. LCKPRJLOSCHNGŽ Changes made to this project will be discarded. o Press F10 to discard your changes. o Press Esc to cancel this operation.  LCKALERT* DOS lock retry. Press F10 to continue... CALLOADERRe Can't use calendar '%s' for resource analysis. HPM will use the project calendar for this analysis. LCKTMPEXCLU HPM can't perform the operation you requested. The template %s is checked out by %s. DSPLSTOFLWy Not enough memory for all the data on a page of your report. Increase your scaling percent or use a smaller paper size. CALREPERR: HPM can't find the calendar referred to by this template. CPSTRCTERR3 Error accessing Fast track -- task won't be added. CPSADDBREACHs The task you added is before the planned start date of the project. To reset the project planned start, press F10. CPFADDBREACHt The task you added is after the planned finish date of the project. To reset the project planned finish press F10. CPSMOVEBREACHt The task you moved is before the planned start date of the project. To reset the project planned start, press F10. CPFMOVEBREACHm The task you moved is after the project planned finish date. To reset the project planned finish, press F10.  CPBADADD� You added a task before the actual start of your project. Clear the actual dates (See F7-Other, Erase) to avoid negative slack. CPBADMOVE� You moved a task before the actual start of your project. Clear the actual dates (See F7-Other, Erase) to avoid negative slack. CPADDDONE- You added a task after a completed project. CPMOVEDONE, You moved a task after a completed project. AFBEFASTRTŠ You entered an actual finish that is before the actual start in task '%s'. Enter a new actual start or actual finish date for the task. MAXDUREXCEED‚ You entered a duration that is greater than HPM's maximum duration. The duration will be truncated to HPM's maximum duration. CPFINDMILEH %s is a milestone. You cannot find milestones in the Fast track window. WBONODECOLLAPÀ You can't %s this task. The task you selected can not be seen in the outline because you set HPM to display the first %d levels. Use the Format menu to change the number of levels displayed. FILEDIRBAD| HPM is unable to locate the directory you specified. Check the complete directory pathname and complete the fill-in again. MUSTGIVPRJNAM You must enter a project name. FILEEXISTSb The file you specified already exists. o Press Esc to cancel. o Press F10 to overwrite the file. NOFILEEXISTb The file you specified does not exist. Check the entire filename and complete the fill-in again. NOPRJBUTARC¾ There is no project '%s'. However, there is an archived project with this name. If you want to use this project, you will have to go to the Project list and get the archived project first. RESBADVERSIONŒ The version of the data which you're trying to access does'nt match the current version of HPM. Use the update utility to update your data. IMPBADDATEIncorrect date format. HPM's import facility was expecting a date and can't understand this date: %s The available date formats are: 10 Sep 1988 - DD/MM/YY dBASE II and dBASE III dates. Lotus 1A or 2 dates. HPM will skip this information. IMPBADDUR�Incorrect duration format. HPM'S import facility was expecting to find a duration field and can't understand this duration: %s Use the following formats: o 10.00 Dys W. o 10.00 HPM assumes days if you're importing tasks and there is no time unit specified. HPM matches the work unit field to the resource efforts when importing allocations. HPM will skip this information. IMPBADNUM� Incorrect number format. HPM'S import facility was expecting to find a number field and can't understand: %s HPM will skip this information. IMPBADWRKUNIT¹ Incorrect time units. HPM's import facility was expecting to find time units on row: %d HPM accepts: o MIN o HRS o WKS o MTH o YRS HPM will skip this information.  SAVEIMPˆ You must save your current changes before HPM can import this file. o Press Esc to cancel. o Press F10 to save your changes and go on. BITMAPOVFLW| Your report configuration will exceed the allowable printer bitmap size. Try printing on narrow paper or using low quality. RESERVENAMEP The name %s is reserved by HPM for its own use. Use another name for your file. TPLNEEDPROJ: You must get a project before running report template %s. IMPBADFILE¾ Incorrect file format: %s HPM doesn't recognize this kind of file. HPM will import the following types of files: o Delimited ASCII o dBASE II/III/III+ o Lotus 1A/2 SBPRJUNCALCº This subproject, %s, has not been calculated and Fast track cannot determine the project start or finish dates. o Press F10 to perform the calculation. o Press Esc to leave Fast track.  EXPABORT@ Press F10 to continue exporting; Press ESC to cancel exporting. TRPT2WIDEDBIIYour report is too wide for dBASE II. You can send a maximum of 32 columns to dBASE II. (Remember to allow room for those columns that can't be changed). o Press Esc to cancel the operation. Then select fewer columns. o Press F10 to truncate the file to 32 columns. PRJNDSCALCEXPÅ You need to recalculate your project, %s, or the exported data won't be accurate. o To recalculate, press Esc to cancel, get that project, and press Ctrl-C; o to continue exporting, press F10. NEEDPLNSFŸ You need to enter a planned start or a planned finish for the project in the project form. HPM needs to have one of these dates to perform the date analysis. IMPPRJDUPTSKµ The task name %s is not unique in the project. HPM can't distinguish which task to update and will ignore this data. You should edit the project and make these task names unique. IMPPRJDUPALLC4There are multiple allocations of %s to task %s. HPM can't distinguish which allocation to update and will ignore this data. You can: o Edit the Allocations list for this task and combine the work for this resource. o Split the task into two parallel tasks and allocate this resource to each task. IMPIMPDUPTSK¸ There are multiple definitions of the task %s in the import file. HPM requires that task names be unique. HPM will only update the first occurrence of this task in the import file. IMPIMPDUPALLCÓ There are multiple definitions of resource %s to task %s in the import file. HPM can't distinguish which allocation to update. HPM will only update the first occurrence of this allocation in the import file. IMPNOTASKE Row %d of the import file has a task %s that is not in this project. IMPNOALLCA There is no allocation of resource %s to task %s in this project IMPROWNOALLCG Row %d of the import file has an allocation that is not in the project  IMPNONEGi Row %d has a negative number. HPM doesn't allow input of negative numbers. This field will be skipped.  WBMOVEOUTWRGPRJÿ You're trying to move a task (or group of tasks) out from under a branch task that belongs to another project. Get the project the branch task belongs to, and then you can move out from under it. (Check the Task form for the name of the project to get.)  WBOMOVEOTHERCUT1  The move you are attempting to make would move all of the tasks out from under task '%s'. Since this task belongs to another project this move is not allowed.  WBOMOVEOTHERCUT2£ The move you are attempting to make would place tasks under the task you are moving. Since the task you are moving belongs to another project this is not allowed.  DELLAG‘ You can't remove a lag now. Be sure the name of a task is in the Remove task fill-in before pressing F10. Use Remove link/lag to remove a lag.  BADDUR_ Incorrect duration format. Type the duration again, using the format: 10.00 Dys W. WBADDMAXLEVELx The Work breakdown of your project can have up to 99 levels. This task would go past that limit so you can not add it. SWITCHFLOPa Insert diskette for drive %s. Press F10 to change the floppy drive to %s:. Press ESC to cancel.  MUSTSWITCHFLOPL Insert diskette for drive %s. Press F10 to change the floppy drive to %s:.  IMPABORT@ Press F10 to continue importing; Press ESC to cancel importing. WBMOVETOPNODEa You're trying to move the topmost task in your Work breakdown structure and that is not allowed. DIDNTLEVELËProject %s was not completely leveled. o If you have entered task planned start dates, display the Other menu and select Erase. Clear all planned dates and level again. o If the tasks in conflict have actual start dates, change one or more of the start dates to avoid resource overallocations. o If you have entered any milestone constraints, display the Other menu and select Erase. Clear all milestone constraints and level again.  NO2FORMS‘ Two forms cannot be displayed at the same time. It is not possible to display two forms in a split window. Select a different pair of windows.  CALDISCREPENCY® A calculation is necessary at this time. The project calendar has changed significantly. To assure the integrity of all task durations, you should recalculate your project. FTREPTOOLONGŽ Your Fast track chart is too long to print. Go to the Fast track window and either set the zoom level lower or switch to a larger timescale.  WBOCHILDMOVEHIDEý When you moved '%s', you also tried to move another task (or asks) to a position under it, but it already has one or more hidden subtasks. HPM moved task '%s', but it can't place other tasks under it. Show the hidden tasks and then complete the move.